Lamar Pedestrian/Bicycle Bridge Facility - Phase One
CIP 825-607-2050SummaryIn 1984, voters approved a project to widen the existing Lamar Boulevard Bridge over Town Lake from 4 lanes to 6 lanes. On March 6, 1997 the City Council took a decision not to add travel lanes and voted to proceed with pedestrian and bicycle improvements. In September of 1998, City Council approved an option of a separate bridge. The City Council authorized HDR Engineering to provide design phase services in January 1999. The design phase was completed after obtaining TxDOT approvals. This project will provide a pedestrian and bicycle bridge on the East Side of the Lamar Boulevard Bridge over Town Lake. The current funding is sufficient for Phase One that includes the bridge over the Town Lake. The alternate consisting of and the bridge over Cesar Chavez Street up to the south side of the Railroad Bridge at 3rd street was not accepted due to funding shortfall. Hike and bike trail at both ends is re-routed to allow room for construction. A central path in the river is kept open for all river traffic. Signs are in place and lights are installed for safety of lake and shore users. A web site is set up to keep track of construction progress. This site is accessible through the City's web site.
StatusAll drilling was completed for underground piers. The foundation tie beams and column base beams are about 90% complete. The upper column bents are flaring out from water and are visible. Steel beam placement will be done in November starting at the south end. The barges in the lake will move back and forth from the north to south shores on regular basis. The helix construction is in full swing at the north end. IssuesFederal ISTEA "Enhancement" funding ($953,252) has been approved for pedestrian/bicycle facilities. DescriptionThe proposed project will address capacity needs for pedestrians and bicyclists at the Lamar Boulevard Bridge and connect the hike and bike trails at north and south end. The entire bridge is wheel chair accessible. Phase Two includes the extension from the bridge at South end of Cesar Chavez to the intersection of 5th and Lamar. This phase will be coordinated with the new Cross Town Bikeway project Basic DataRevised October 16, 2000 Back to the October 2000 Contents |
|
|
|
![]() |
Austin City Connection - The Official Web site of the City of Austin |
| Contact Us: Send Email or 512-974-6418. | |
| Legal Notices | Privacy Statement | |
| © 1995 City of Austin, Texas. All Rights Reserved. | |
| P.O. Box 1088, Austin, TX 78767 (512) 974-2000 | |